Jump to content
APC Forum

Getting ready for new year?


Recommended Posts

Posted (edited)

Finishing up the last of the bombettes (240 total).then I'll start with the 1.75" and the 2.5" shells, hopefully the shells will dry in time, if not, at least I'll have the cakes ready lol

post-14383-0-70207100-1387939050_thumb.jpgpost-14383-0-76199600-1387939088_thumb.jpgpost-14383-0-05992100-1387939183_thumb.jpgpost-14383-0-68849900-1387939231_thumb.jpg

post-14383-0-72241300-1387939160_thumb.jpg

Edited by asdercks
Posted

That looks good :D

  • Like 1
Posted

It is looking realy nice gentlemen :D

  • Like 1
Posted (edited)

Well guys it seems those bombettes I've working with will not be so spectacular after all, I test/shoot some of them and some of the stars were getting blown blind, don't know if its the prime not working (bp + 10% silicon) or the burst (2 grams of slow nitrate flash)...should've tested them before making the whole batch at the same time, oh well, it sucks.
At least I still have the 1.75" and the 2.5" ball shells, we'll see how they work

Edited by asdercks
Posted

Fire em all at once, they still make noise :)

 

Dan.

Posted

Fire em all at once, they still make noise :)

 

Dan.

Dan you read my mind, hahahahaha also I will throw a bunch of stars into the mortar tube so that when it shoots it will also look like a star mine that way I'll have more light and colors plus the noise

Posted

How many days you have spend?? You seem to have big plan for NYE.

I have been working on this project for the last 2 or 3 weeks, it took me about 4 days just to pump all the stars about 3 kilos of comp, today I'll start loading the cake tubes with bp, colored stars, some dragon eggs and the inserts. after that I'll start pasting the 1.75" and the 2.5" shells so I am still working, and yes, big plans for NYE hahahahahaha

  • Like 1
Posted (edited)

This is my previous assortment. In addition there are a couple of shells and rockets. :D

 

https://www.youtube.com/watch?v=7o9rYo30a1A

Nice!!!! seems you'll have quite a display going on, best of luck!.

I wish i could go buy fireworks here in San Diego, CA. but the laws here are tight. :ph34r:

Edited by asdercks
Posted

God-dam! Viking, :rolleyes: It is locking good :D :rolleyes:

Posted (edited)
6x 4" shells

5x 3" shells

2x 2" comets

And i prepapare a 6" canister with six 2" shells and stars.


Some shells for NY 2014

Edited by pyrogeorge
Posted

 

6x 4" shells
5x 3" shells
2x 2" comets
And i prepapare a 6" canister with six 2" shells and stars.

 

Nice! seems you're ready for NYE, hope you post some vids to see how your shells looked.

Posted
I'll just have a couple of 4" shells, can't shoot anything at the location I'm at. :(
Posted (edited)

21x 3lb core burners 16x 3lb whistle motors will be taking up 23x 4" shells and 3x6" shells and 2x 10"x1"id buzz bombs and a 2 stage whistle and a 3 stage coreburner to whistle to whistle

 

http://www.amateurpyro.com/forums/gallery/image/2461-more-motor-porn/

you have to add as friend to view

 

 

still a lot of stars left over from the shell building so i know some of you can appreciate how many hours work is in that little pic

Edited by leedrill
Posted

21x 3lb core burners 16x 3lb whistle motors will be taking up 23x 4" shells and 3x6" shells and 2x 10"x1"id buzz bombs and a 2 stage whistle and a 3 stage coreburner to whistle to whistle

 

http://www.amateurpyro.com/forums/gallery/image/2461-more-motor-porn/

you have to add as friend to view

 

 

still a lot of stars left over from the shell building so i know some of you can appreciate how many hours work is in that little pic

 

Wow, very impressive!

 

How many hours was put into stars? :)

 

I saw your picture of your GG KNO3, do you mind if I ask where you got that? Looks to be some high quality stuff!

Posted (edited)

id have to say for the about 12kg of stars i rolled and the probably 4kg of prime and dark relay used i spent about 30 to 40 hours in total screening comps and rolling was a lot of time i dry all my stars when i make cores then dry again when at size then dry each layer of prime aswell

 

the kno3 is from aus so would not be worth it for you i dont think

 

 

p.s. all motors where pressed with a bottle jack the 20 or so incriments that go into a 10" long core burner render each motor to being put in the support to taken out takes me about 1 hour so alone there is about another 40 or so hours work in the motors and then the building and all the rest of the stuff like cutting sticks and so on id say id be at about 200 hours put in for the night

Edited by leedrill
Posted
That's a lot of work there mate. I hope you have a nice big place for launching. Are you going camping out bush for nye?
Posted
*bows in respect* wow, that's some serious dedication right there. I am looking forward to seeing some of these!
Posted

21x 3lb core burners 16x 3lb whistle motors will be taking up 23x 4" shells and 3x6" shells and 2x 10"x1"id buzz bombs and a 2 stage whistle and a 3 stage coreburner to whistle to whistle

 

http://www.amateurpyro.com/forums/gallery/image/2461-more-motor-porn/

you have to add as friend to view

 

 

still a lot of stars left over from the shell building so i know some of you can appreciate how many hours work is in that little pic

Nice rockets Lee, the sky will be beautiful.

Posted

Nice! seems you're ready for NYE, hope you post some vids to see how your shells looked.

Thanks! Yes, i will post the videos .

Posted

I'll just have a couple of 4" shells, can't shoot anything at the location I'm at. :(

Tell me about not being able to shoot, I live in the city and december is pretty much the only month of the year when I can shoot a little without getting in troble with the police, the problem is that I don't have that much time to fine/tune my shells so Im just hoping that whatever I shoot works well, thats why I keep reading and asking questions in this site lol. hope your shells do great

Posted

21x 3lb core burners 16x 3lb whistle motors will be taking up 23x 4" shells and 3x6" shells and 2x 10"x1"id buzz bombs and a 2 stage whistle and a 3 stage coreburner to whistle to whistle

 

http://www.amateurpyro.com/forums/gallery/image/2461-more-motor-porn/

you have to add as friend to view

 

 

still a lot of stars left over from the shell building so i know some of you can appreciate how many hours work is in that little pic

Respect! that is all I can say, and I thought I suffered pumping 3 kilos of stars, :D

Posted
Not too much quantity this year, but I have at least finished a 8" ball shell which I am looking forward too. Some pictures from the building:


http://i.imgur.com/JxzLwAE.jpg
http://i.imgur.com/f6C4Go1.jpg
http://i.imgur.com/5tucFhF.jpg
http://i.imgur.com/Sd5evlQ.jpg
http://i.imgur.com/3sbSZBx.jpg
http://i.imgur.com/3EaxZ6C.jpg
http://i.imgur.com/ez2aeuz.jpg
http://i.imgur.com/HmlEPip.jpg
http://i.imgur.com/V7uZloN.jpg

 

  • Like 1
Posted

Nice stuff guys, I'm going for 3 1lbers, my first 4" ( brocade to blue)

2.5" 2 ring timed report and a 3" italian style can which when I work out what it's called I'll say :)

 

All if the pure nitrate does not Cato the first non headed motor :)

 

Dan.

×
×
  • Create New...